Order now to secure the safety and reliability of your piping system!
Key Features
-
Superior Sealing Performance
Manufactured to national (GB) or American (ANSI) flange face standards and paired with high‑temperature, pressure‑resistant gaskets to ensure leak‑free connections. -
High Pressure Rating
Available in carbon steel, low‑alloy steel, stainless steel, and other materials to meet requirements from low pressure up to 25 MPa. -
Easy Installation & Maintenance
Flange faces are bolted symmetrically and evenly for rapid assembly. For routine inspections or service, the flange connection can be disassembled quickly, saving maintenance time. -
Corrosion & High‑Temperature Resistance
Surface treatments include hot‑dip galvanizing, electrophoretic coating, or epoxy spraying. Stainless steel options (304/316L) are available to withstand acidic, alkaline, salt‑spray, and high‑temperature environments. -
Complete Range of Standards & Customization
Compliant with ANSI, DIN, JIS, GB and other international/domestic standards. Nominal diameters from DN15 to DN1200 are stocked, and non‑standard sizes can be custom‑manufactured per project requirements.
Technical Specifications
Parameter | Range / Options |
---|---|
Flange Standard | GB/T 9112‑2010, ANSI B16.5, DIN 2633, JIS B2220 |
Nominal Diameter | DN 15 – DN 1200 mm |
Nominal Pressure | PN 0.6, PN 1.0, PN 1.6, PN 2.5, PN 4.0, PN 6.4; 150 lb, 300 lb… |
Flange Face Type | Flat Face (FF) / Raised Face (RF) / Ring Type Joint (RTJ) |
Material | Carbon Steel (WCB), Low‑Alloy Steel (P11/P22), Stainless Steel (304/316L) |
Operating Temperature | –30 °C to +550 °C (depending on flange & gasket materials) |
Surface Finish | Hot‑Dip Galvanized / Electrophoretic Coating / Epoxy Spray / Pickling & Passivation |
Typical Applications
-
Petrochemical plants (catalyst towers, heat exchangers, storage tanks)
-
Power plant boilers and piping systems
-
Municipal water supply & wastewater treatment networks
-
HVAC (Heating, Ventilation & Air Conditioning) systems
-
Food, pharmaceutical, and beverage production lines
-
Various chemical, petrochemical, paper, and shipbuilding industry pipelines
Installation & Maintenance
-
Installation
-
Align flange faces and insert the appropriate gasket;
-
Tighten bolts evenly in a crisscross pattern to the specified torque;
-
Inspect gasket compression, perform a pressure test, and then commission the system.
-
-
Maintenance
-
Regularly check bolt tightness and inspect flange gaskets for wear;
-
To replace a gasket, loosen bolts, remove the old gasket, clean flange faces, install a new gasket, and retorque bolts to specification;
-
For highly corrosive or high‑temperature services, shorten inspection intervals to ensure long‑term reliability.
-